This RFF and EDF report examines how the community of Tonawanda, New York, has dealt with the 2016 closure of a local coal-fired electricity plant.

Download

Date

Oct. 30, 2023

Authors

Daniel Propp and Wesley Look

Publication

Report

Reading time

39 minutes

List of Acronyms

1. Introduction

The United States is undergoing an energy transition. The share of electricity sourced from fossil fuels has steadily declined over the past decade, a consequence of both growing concern over climate change and the availability of low-cost renewable energy. Coal has faced a particularly steep decline—once the source of over half of the country’s electricity, it now supplies less than one-fifth (EIA 2022).

This shift away from traditional energy sources puts at risk those workers and communities for whom fossil fuel production or industrial use is a key driver of prosperity. Thus, effective stewardship of the energy transition demands that policymakers prioritize fairness and opportunity for these groups. This concept of fairness for economically dislocated workers and communities is widely known as “just transition.”

Facilitating a just transition is no easy task, as the challenges facing communities in transition are diverse and deeply rooted. But as the shift away from fossil fuels accelerates, the need for effective methods of intervention—including thoughtful public policy—to address these challenges becomes acute.

The experiences of individual communities that have dealt with the loss of fossil fuel–related economic activity can serve as a valuable guide for how to pursue a just transition. This report examines the experience of one such community, Tonawanda, New York, and its process of dealing with the closure in 2016 of the C. R. Huntley Generating Station, a coal-fired electricity plant. To understand the impact of the closure and how the community responded, we analyzed tax documents, pollutant reports, municipal budgets, and news coverage. We also conducted a series of telephone interviews in 2020 with the following individuals: Joseph Emminger, Tonawanda’s town supervisor; Richard Lipsitz, president of the Western New York Area Labor Federation, AFL-CIO; Dave Wasiura, assistant director of the local chapter of United Steel Workers; Cindy Winland, director of strategic priorities at Delta Institute; and staff in the Office of Senator Chuck Schumer.

The Tonawanda experience provides illustrative examples of how a single facility’s closure can create challenges for local government budgeting and disrupt a variety of industrial operations in the local economy—some of which may be unexpected. Tonawanda also offers insights into how a diversity of stakeholders—including labor unions, environmental advocates, and local government—can work together effectively to facilitate transition, along with how federal and state government programs can provide important financial support. Given the diversified economy of the broader Buffalo metro area, however, the Tonawanda experience may have limited applicability to communities embedded in larger regions undergoing energy transition, such as Central Appalachia, where coal mining has precipitously declined in recent years. In these areas, communities may face larger economic and fiscal challenges, have more complex stakeholder dynamics, and enjoy less support from state government. That said, insights from the Tonawanda case can be helpful for communities undergoing transition of any kind, taken in context. These insights include the following:

  • Start planning early. A proactive approach to transition is essential for securing funding, coordinating stakeholders, and planning redevelopment. Communities and organizations facing a transition should begin planning as soon as it becomes clear that a facility will shut down, and energy companies should endeavor to provide early warning.
  • Formalize the transition. Without dedicated personnel and funding, transition planning can lack focus and lose momentum. To the extent possible, communities should seek to formalize the transition process, such as by establishing a committee or task force charged with creating an open forum for community deliberation, developing policy solutions, and potentially conducting advocacy and implementation.
  • Engage a diversity of stakeholders. Within the sort of civic forum just described, it is important to engage diverse stakeholders early to ensure representation of the variety of community interests that will ultimately have a say in transition and development decisions.
  • Identify a common objective. Clearly defining a common objective at the outset can provide the platform needed for effective cooperation among stakeholder groups.
  • Expect and plan for indirect consequences. Proactive engagement with a diverse array of stakeholders can also help planners anticipate potential indirect consequences of a facility’s closure. For example, the Huntley closure jeopardized the availability of water for industrial uses in Erie County, which historically depended on pumping facilities at the Huntley plant. Energy transition programs should have sufficient flexibility to address local variations.
  • Procure transition funding from state and federal agencies. The retirement of a coal facility can eliminate local government tax revenue, making it difficult to locally fund transition efforts. Dedicated state and federal transition funding can help local governments mitigate the immediate fiscal impact of the shutdown and provide them with a window in which to plan for an economic transition.

2. Background

2.1. Tonawanda and Erie County

Tonawanda sits on the eastern (American) bank of the Niagara River, 11 miles southeast of Niagara Falls and 7 miles north of the city of Buffalo. While Tonawanda is in some ways a suburb of Buffalo, it is also an industry hub in its own right, hosting 3,690 manufacturing jobs, or 8 percent of the Buffalo metro region total (US Census Bureau 2021a, 2021b; Headwaters Economics 2020). Tonawanda’s western portion, along the Niagara River, is home to large manufacturers, including General Motors, Indeck Yerkes, PeroxyChem, 3M, and Linde (ERIS 2018).

In 2018, the median household income in Tonawanda was $61,571. This is lower than the median income for New York State ($68,486) and for the United States ($62,843). Today the largest sectors of employment in Tonawanda are healthcare (15 percent of total employment), education (15 percent), and retail (13 percent) (US Census Bureau 2021a). A significant portion of this workforce is unionized. A 2019 study found that 20 percent of all workers in the Buffalo-Niagara Region are union members, placing it in the 91st percentile of union membership across the country (Weaver 2019). The labor union United Steel Workers (USW) Local 135 represents around 1,600 workers in Tonawanda’s industrial sector (Watson 2018b).

Tonawanda is part of Erie County, which covers 1,227 square miles at the western edge of New York, on the shore of Lake Erie. As of 2019, Erie County was home to 919,000 people. Of this population, 255,000 reside in Buffalo, the county seat and New York’s second-largest city (US Census Bureau 2021a).

For much of the nineteenth and twentieth centuries, Erie County was an economic powerhouse, serving as a major trade and manufacturing hub for the region. Its prosperity dates back to 1825, with the completion of the Erie Canal. In the years that followed, the population of the region exploded as it became a strategic waypoint connecting the Great Lakes region to East Coast markets. As the century wore on, the Niagara River corridor developed a thriving mill industry (Glaeser 2007).

Around the turn of the century, Erie County evolved into a manufacturing hub. The construction of a hydroelectric generating plant at Niagara Falls in 1893 made Erie County one of the only places in the country with electricity at the time (Glaeser 2007). This development, in addition to the large amounts of coal being transported via the Erie Canal, made the region an ideal location for heavy manufacturing. Between 1890 and 1930, steel, aluminum, and automobile manufacturing spawned tens of thousands of jobs in the region, and the county’s population grew from 323,000 to 762,000. This prosperity persisted for several decades, with the county’s population peaking at 1.1 million in 1970 (ESD 2000).

Over the second half of the twentieth century, Erie County traced a path of economic hardship reflective of many other Rust Belt communities. Starting in the 1970s, as transport by train and truck became more cost-effective, access to waterways like the Erie Canal was less of a competitive advantage. Dramatic improvements in electricity transmission diminished the benefit of proximity to hydropower, while a host of globalization developments (e.g., lower barriers to trade, relatively cheap foreign labor and transportation costs, and improved telecommunications) incentivized many manufacturers to relocate overseas (Klein 2016).

Erie County’s manufacturing sector has now seen several decades of decline, employing 45,000 people in 2019, down from 130,000 in 1970. In 1970, manufacturing accounted for 27 percent of Erie County’s jobs; in 2019, it accounted for only 8 percent. Over this same period, total annual labor earnings from manufacturing in Erie County fell from $8.8 billion to $3.9 billion (in 2019$; Headwaters Economics 2020).

The manufacturing decline translated to broader socioeconomic challenges. The county’s population dwindled along with the economy—after peaking at 1.1 million in 1970, it decreased steadily to 919,000 in 2019. This reduction was driven chiefly by outmigration (Headwaters Economics 2020). Over the same period, personal income in Erie County grew at less than half the rate of that in the United States as a whole, and employment at less than a third.

These trends were especially severe in Tonawanda, which saw its population decline by 33 percent between 1970 and 2019, twice the rate of the larger Buffalo-Niagara region (US Census Bureau 2021a). Eighty percent of those who continue to work in Tonawanda today live elsewhere, likely as a result of Tonawanda’s high housing costs and low residential turnover (Tonawanda Tomorrow 2017).

After decades of decline, manufacturing employment in Erie County has stayed roughly constant since 2010. The sector remains an attractive employer, paying an average of $68,283 per year, 31 percent above average for Erie County (Headwaters Economics 2020). Meanwhile, other industries have expanded as manufacturing declined. Employment in the service sector has almost doubled since 1970, with particularly large gains appearing in the financial services sector (Robinson 2020a). The Covid-19 pandemic damaged the region’s economy but appears to have largely spared the manufacturing industry, in which employment rebounded quickly after a dip in March and April 2020 (Robinson 2020b; WKBW 2020). The full scope of the pandemic’s impact on the region, however, is not yet clear.

3. Significance of Huntley Generating Station for Tonawanda

The C. R. Huntley Generating Station (hereafter Huntley) had been a feature of Tonawanda’s riverfront and an important component of the local industrial economy for over a century. The plant began operating in 1916 with the completion of a single 20 megawatt (MW) coal-fired unit. By 1931, six additional units had been constructed, bringing the total capacity to 305 MW. Between 1942 and 1958, Huntley added six more—larger—units, reaching its maximum capacity of 1,150 MW in 1958, before retiring its older, smaller units. Huntley’s owner, the Niagara Mohawk Power Company, maintained the plant’s 780 MW of generating capacity from 1963 through 1998, when the reorganization of the New York power sector forced the company to auction off all its generating assets (NYSDEC 2018). In 1999, Niagara Mohawk sold Huntley to New Jersey–based NRG Energy (Kunkel et al. 2014; DiSavino and O’Grady 2014).

From 1999 to 2016, NRG operated Huntley via a special purpose vehicle named Huntley Power, LLC. Between 2000 and 2005, Huntley generated, on average, 3.2 terawatt-hours (TWh) of electricity per year (FERC 2000–2016). During this same time, the plant reported yearly revenue between $115 million and $190 million (Kunkel et al. 2014; SEC 2002).

3.1. Role in Tonawanda’s Economy

At its peak utilization, Huntley was both a sizable and attractive employer. Workers at the plant—who numbered more than 200 in the early 2000s—reportedly received salaries and benefits that exceeded the regional average, with many retaining membership in the local electrical workers union (see Section 4.1).

Throughout its operation, the Huntley Generating Station pumped untreated (raw) water from the Niagara River to use as coolant in its generating units. It also supplied a portion of the water it pumped to local industrial facilities. As far back as 1920, the owners of the property maintained a system of easements, licenses, and leaseholds on the pumps, pump houses, and water lines; these agreements allowed the nearby businesses to obtain raw water from the site at an affordable rate (Holmes 2019; Fischer 2018a). By the time the plant shut down, Huntley’s pump houses were supplying 19 million gallons of raw water per day to local manufacturers, including PeroxyChem, Sumitomo, and 3M (Watson 2018b). These companies did not pay for the water on a per-use basis, but rather paid a sum specified in the agreement in exchange for year-round access to Huntley’s intake bays. This system served as a boon for these companies, as drawing potable water from the municipal water treatment plant would have cost local businesses an additional $24 million per year (Holmes 2019).

Lastly, the Huntley plant occupied a valuable plot of land along the Niagara River. The property consisted of 219 acres roughly three miles from the Tonawanda town center, including an 84-acre parcel of land, directly abutting the Niagara River, on which the generating plant and several outlying structures stood; an 18-acre, undeveloped plot of land across the street from the main facilities; and a 117-acre plot of land about a mile away, which hosted a fly ash landfill (Holmes 2019). According to accounts from local leaders, the assessed value of $194.4 million likely understated the importance and potential of the property. Town Supervisor Joseph Emminger, for example, noted that in a town with almost no vacant space, a riverfront property that large with such a “beautiful view” was of immense value to the town and its community members.

3.2. Fiscal Significance

Local property tax revenue from Huntley went to three local governments: the Kenmore-Tonawanda School District, the Town of Tonawanda, and Erie County. Based on its assessed property value of $194.4 million (which was equivalent to 0.6 percent of Erie County’s total property tax base and 11.2 percent of Tonawanda’s), Huntley’s total annual property tax liability for the early 2000s would have been roughly $23.8 million (Habuda 2011a; Poloncarz 2010; NYS ORPTS 2010; Erie County 2009, 2010). NRG deemed this value prohibitively expensive and negotiated a series of tax exemption agreements. These agreements, signed by NRG and the Erie County Industrial Development Agency (ECIDA), enabled the company to provide payments in lieu of taxes (PILOT) to its three taxing jurisdictions. Annual payments would follow a schedule specified in the agreement. The allocation of these PILOT revenues among the town, school district, and county would reflect each jurisdiction’s relative tax rate in the year the agreement was signed. One such agreement, signed in 2001, set out a schedule whereby Huntley’s property tax burden ranged from $13.3 million in 2002 (the first year of the agreement’s enforcement) to $11 million in 2008 (its final year). Of these PILOT funds, 65 percent went to the Kenmore-Tonawanda School District, 21 percent to the Town of Tonawanda, and 14 percent to Erie County for the duration of the agreement (ECIDA 2001).

This PILOT agreement expired in 2008, leaving Huntley without a tax exemption. On the grounds that it had retired some of its capacity, NRG threatened to sue over its $194.4 million assessment, a suit that would, if successful, force the school district to repay $18 million of what NRG deemed unfairly high PILOT payments (Habuda 2011b). The company dropped the lawsuit after the parties agreed to a new 20-year PILOT schedule and an assessment of $72.9 million for the property (Habuda 2008). A further dispute over the timing of the agreement delayed its implementation until 2013, so from 2009 through 2012, NRG paid $14 million to $15 million in property taxes annually (Poloncarz 2009, 2010; Shenk 2011; Mychajliw 2012; Habuda 2012; NYS ORPTS 2010; State of New York 2009, 2011, 2012; KTUFSD 2009, 2010, 2011, 2012).

The new agreement tied Huntley’s property tax burden to the plant’s operable capacity. In 2013, for example, NRG would pay $16,082 for every MW it had in operation, with the payments per MW rising every subsequent year. Under this new agreement, Huntley paid out between $6.0 million and $8.1 million annually until it shut down, with the school district, town, and county receiving 52 percent, 33 percent, and 15 percent, respectively (ECIDA 2009).

Even with declining profitability, Huntley was a major source of tax revenue in the region. In 2010, Huntley was Tonawanda’s and the school district’s largest taxpayer, providing 5.1 percent of the town’s operating budget and 4.8 percent of the school district’s (KTUFSD 2009; Town of Tonawanda 2016). It was also Erie County’s third-largest taxpayer, providing 0.12 percent of its total revenue for the year (Poloncarz 2010).

3.3. Environmental Impacts

Decades of heavy manufacturing in Erie County have resulted in contamination to the region’s soil, air, and water. The EPA reports elevated levels of polychlorinated biphenyls (PCBs), dioxin, dibenzofuran, polychlorinated aromatic hydrocarbons (PAHs), and pesticides in the soil and groundwater. Certain communities near coking or coal combustion facilities experience unhealthy ambient levels of sulfur dioxide, nitrous oxides, and particulates (EPA 2020a). The New York Department of Environmental Conservation has identified 96 sites in need of remediation within Erie County and 10 in Tonawanda alone (NYSDEC 2020b). Environmental health remains a pressing concern for local leaders despite ongoing EPA remediation activities (EPA 2020a).

In 2000, Huntley emitted 52,000 tons of atmospheric sulfur dioxide, 11,0000 tons of nitrous oxide, and 4.2 million tons of carbon dioxide (EPA 2020b). From 2002 to 2013, Huntley was Erie County’s biggest source of air pollution for all but one of these years, even after switching from Appalachian to western coal in the 1990s to lower sulfur dioxide emissions. To further reduce emissions, NRG completed a $35 million sulfur reduction project in 2005 and spent $115 million on “back-end environmental controls” in 2009. The plant’s declining utilization also played a role in reducing emissions (Pignataro 2014). In 2015, the plant emitted only 1,000 tons of sulfur dioxide, 251 tons of nitrous oxide, and 482,000 tons of carbon dioxide (EPA 2020b). Between 2005 and 2017, Huntley’s carbon dioxide, nitrous oxide, and sulfur dioxide emissions declined in tandem with net generation (Figure 1, Panels A and B).

Figure 1. Huntley’s CO2, NOx, and SO2 Emissions, 2005–17

Figure 1 Web.png

Huntley is also responsible for a significant amount of soil pollution. In 2014 alone, the plant released 116,000 pounds of ammonia, 3,400 pounds of barium compounds, 22,000 pounds of acid aerosols, 38,000 pounds of hydrogen fluoride, 93 pounds of lead compounds, and 7.2 pounds of mercury compounds (EPA 2020d).

3.4. Retirement

By 2008, in part because of increased competition from natural gas and renewables, Huntley became increasingly uneconomical, and net generation gradually declined through 2017, when NRG permanently retired the plant (Figure 2). State-level regulations on power plant carbon emissions (the Regional Greenhouse Gas Initiative, or RGGI) and on coal waste management also have made it more expensive to operate a coal plant. As a result, all of New York’s coal plants have been retired or mothballed since 2000 (GEM 2021).

Figure 2. Huntley’s Net Electricity Generation by Unit, 2005–17

Figure 2.png

Data source: FERC (2000-2016).

In 2006, NRG retired two of Huntley’s coal-fired units (63 and 64) because of aging and underutilization, reducing the plant’s generating capacity to 636 MW. A year later, it retired two more units (65 and 66), reducing capacity further, to 436 MW. From 2007 to 2016, Huntley used only two units (67 and 68), which operated less and less as the years went by (Kunkel et al. 2014). Between 2005 and 2015, Huntley’s net generation dropped 85 percent, leaving it operating at 11 percent of its capacity for its last full year (NYISO 2019a).

As a consequence of lower utilization, Huntley’s revenues fell steadily from 2005 through 2016 (Figure 3). In its final full year of operation, the plant reported only $19.4 million in revenues, a 90 percent drop from the $188.8 million it reported in 2005 (FERC 2000–16).

Figure 3. Huntley’s Annual Revenues

Figure 3.png

Data sources: Kunkel et al. (2014); SEC (2002).

During Huntley’s decline, NRG made several efforts to keep the plant open through alternative means. In 2006, the office of New York governor Pataki announced a billion-dollar incentive program to build a “clean coal” facility somewhere in the state. NRG submitted a $1.5 billion plan for a 680 MW coal generator with integrated gasification combined-cycle technology and carbon capture capability (Buffalo News 2006). The plan won conditional approval from the New York Power Authority (NYPA), which pledged to fund the project, provided NRG could bring the cost down to $1 billion. A year and a half later, though, the plan’s cost had ballooned to $2.3 billion, and NYPA formally withdrew support (Buffalo News 2008).

Then, on October 14, 2015, NRG applied to the Federal Energy Regulatory Commission (FERC) for a Reliability Support Services Agreement (RSSA), a mechanism through which state regulators use money from ratepayers to guarantee economic returns to a plant that is deemed essential for grid reliability (Waldman 2015). This agreement, if approved by the New York Independent System Operator (NYISO), would have kept Huntley running until 2020 and collectively cost New York ratepayers $260 million (Richardson 2015).

On August 28, 2015, the New York Public Service Commission (NYPSC) had requested that both the NYISO and National Grid (the grid operator in that part of New York) conduct reliability studies to determine what impact closing Huntley and another coal plant called Dunkirk would have on the grid (Addepalli 2015). On October 30, both organizations concluded their studies, finding that shutting down both plants would not materially harm the grid’s reliability (Akter 2018). Accordingly, on December 28, the NYPSC notified FERC and filed a motion to dismiss the RSSA application (Drexler 2015). FERC denied NRG’s application, setting the power plant on track for permanent retirement. No further actions were taken to keep Huntley open, and on March 1, 2016, the plant permanently stopped generating electricity.

4. Transition Issues for Tonawanda

Huntley’s closure had ramifications for Tonawanda’s tax revenue and associated public services, as well as the broader economy and workforce. This section examines such impacts associated with Huntley’s decline between 2000 and 2016.

4.1. Impacts on the Local Workforce

Before NRG began retiring generating units, Huntley employed roughly 250 workers on-site. These workers were represented by the IBEW Local 97 (IBEW 2020). They typically earned $40–$45 per hour, or 135–150 percent of the Erie County average earnings per job at the time (Lipsitz, interview with authors, 2020; Headwaters Economics 2020). Additionally, the workers enjoyed relatively generous benefits.

With profitability and utilization declining, NRG gradually reduced its workforce. By the time Huntley closed permanently in 2016, its workforce had already declined to 79 (Watson 2019a). As the plant approached closure, union leaders sought a way to help these 79 workers transition to a stable situation (either new employment or retirement) after leaving Huntley.

4.2. Impacts on the Kenmore-Tonawanda Union Free School District

The Kenmore-Tonawanda Union Free School District (KTUFSD) received the majority of Huntley’s PILOT revenue, which accounted for 5–9 percent of the district’s revenue in the early 2000s (KTUFSD 2001–2010; ECIDA 2001, 2009). However, consistent increases in school taxes and a surge in federal and state support in 2015 effectively compensated for the loss of PILOT revenue.

A more pressing issue for the district during this period was student enrollment, which had been declining ever since the economic boom of the 1960s. Between 2000 and 2016, total enrollment in the district dropped 25 percent (NYSED 2005, 2016). As a result, the district reported staff reductions for three consecutive years, from 2006 to 2008, and even closed one school, Thomas Jefferson Elementary, in 2013 ( KTUFSD 2022).

So while Huntley’s decline and eventual closure presented a challenge, it was only one of multiple challenges facing the district at that time. The loss of PILOT revenue, while significant, resulted in a plateau rather than a decline in the district’s overall revenue (Figure 4).

Figure 4. Kenmore-Tonawanda Union Free School District Annual Revenues

Figure 4.png

Data source: KTUFSD (2000–2020)

4.3. Impacts on the Town of Tonawanda

The Town of Tonawanda also faced an extended decline in revenue from Huntley. Under the agreement that went into force in 2002, PILOT revenue from the power plant accounted for roughly 3 percent of the town’s operating budget (ECIDA 2001). In August 2016, the threat of potential litigation forced the town to reduce Huntley’s property value to $13 million, down from $194.4 million in 2008 (Popiolkowski 2016; Habuda 2008). Under this new valuation, Huntley’s annual contribution to Tonawanda’s coffers fell to $172,000 (roughly 0.2 percent of the town’s budget), down from $2.6 million in 2002, and it remained at roughly the same level as of 2020 (Erie County 2020b, 2020c).

The municipal government largely managed to withstand the financial pressure wrought by Huntley’s decline. The town’s annual budget has remained relatively constant, at around $100 million, and Town Supervisor Joseph Emminger noted that the town did not lay off anyone as a result of decreased PILOT revenue, nor did it have to curtail any municipal services (Town of Tonawanda 2016).

4.4. Impacts on Erie County

In 2002, Huntley was Erie County’s third-largest taxpayer, contributing $1.8 million in PILOTs , or 0.14 percent of the county’s total revenue (ECIDA 2001; Poloncarz 2002). By 2015, that amount had decreased to $0.8 million (Figure 5). As Huntley accounted for a relatively small portion of county revenue, there have been no reports of a loss of county services or personnel due to Huntley’s decline. Erie County’s revenue stream increased by 30 percent between 2002 and 2019 (Poloncarz 2019).

Figure 5. Huntley’s Total Tax and PILOT Liability, 2003–19

Figure 5.png

Data sources: ECIDA (2001, 2009; Erie County (2020b).

4.5. Impacts on Land Use

With almost a mile of riverfront and an unobstructed view southward toward Grand Island and Peace Bridge, Ontario, the Huntley property has significant economic and recreational potential. Residents feared that leaving it undeveloped and in a state of decay would forgo both a once-in-a-generation development opportunity and necessary property tax revenue (Emminger, interview with authors, 2020).

But the property also contained potentially dangerous contamination, thanks to a century of coal combustion and storage. An environmental assessment in 2018 found that arsenic contamination in the soil exceeded the EPA allowed limit by up to 3,000 percent (EPA 2001, 2020d). Additionally, investigators found petroleum contamination where the coal pile had previously stood. Such pollution presented a danger to local residents and required remediation before any development could occur (see Box 1).

Box 1. The Case of Bethlehem Steel

Residents of Tonawanda saw a cautionary tale in the case of the Bethlehem Steel plant in nearby Lackawanna, New York. The plant had served for 60 years as an economic powerhouse for the region, employing over 22,000 workers at its peak in the late 1960s. But in 1983, after years of declining profitability, the owners ceased steel manufacturing at the plant, laying off 7,000 workers at once. The plant continued to operate at diminished capacity for 18 more years—primarily focused on coke production—before being shut down for good in 2001 when Bethlehem Steel declared bankruptcy (Falsone 2015).

The shutdown of the plant left vacant 1,100 acres of land and several buildings. Since its decline, a series of redevelopment plans have been proposed, though none managed to gain traction. Parcels of the land have been sold off to support a wind power plant and a bike path, but the majority of the property remains abandoned, contaminated, and rusting. A fire at the site in 2016 further contributed to a sense of neglect (Tan and Epstein 2017).

Today the remains of Bethlehem Steel are visible to drivers on Route 5 and represent to many a monument to the region’s economic decline. As Tonawanda prepared for the shutdown of Huntley, residents were eager to avoid the path of Bethlehem Steel. Town Supervisor Joseph Emminger declared, “We are determined not to allow Huntley to become like Bethlehem Steel in Lackawanna, sitting vacant and decaying for decades—to become an eyesore on the Tonawanda waterfront” (Fischer 2017b). To both substantively and symbolically revitalize their town, Tonawanda residents were determined to sell and redevelop the property as quickly as possible.

4.6. Impacts on Industrial Water Supply

Because Huntley was a major source of raw water supply for industries in the area, town officials and local manufacturers were concerned that this supply might be interrupted by the plant’s closure. Town officials claimed that NRG “wanted out of the water business,” though NRG maintained that it was willing to negotiate contract extensions (Fischer 2018a). Switching their water intake to the municipal water treatment plant would have cost local businesses $24 million annually. According to one source, such an occurrence risked eliminating up to 3,000 jobs and further reducing Tonawanda’s tax base (Fischer 2018b).

The town proposed a plan in January 2018 to build a new pump station at its municipal water treatment plant, estimating that the pump station would cost $27.2 million and take three years to construct (Fischer 2018b). Several firms indicated a willingness to help finance the facility but balked at the price tag (Watson 2018b). A major campaign ensued to provide grant funding to the project and persuade NRG not to interrupt the water supply. Under pressure from local groups, State Senator Chris Jacobs (R-60) and State Assemblyman Robin Schimminger (D-140) began to advocate for state grant funding to support the pump station. In April 2018, Senator Chuck Schumer (D-NY) traveled to Tonawanda to publicly urge NRG not to cut off the water supply (Buffalo News 2018a; see Section 7.3 for updates on this process).

5. The Huntley Alliance and State Support

Even before NRG announced plans to close Huntley, local leaders feared what would happen to Tonawanda if the plant shut down, including the transition issues discussed in the previous section. By fall 2013, Peter Stuhlmiller, the president of the Kenmore-Tonawanda Teachers Association, was worried that such an event was imminent. He contacted Richard Lipsitz, the president of the Western New York Area Labor Federation (WNYALF), AFL-CIO, to discuss what might be done to protect the school district if Huntley shut down. The two men also engaged Rebecca Newberry, the executive director of the Clean Air Coalition of Western New York (CACWNY), which had long been concerned about the environmental and health impacts of the plant. The group, alarmed that no plan existed to deal with the impacts of Huntley’s eventual shutdown, decided to take action to address the challenge (McGowan 2017a). In Lipsitz’s telling, their primary goal was to mitigate the immediate effects of Huntley shutting down. A secondary goal, if the first succeeded, would be to set in motion a long-term planning process to support the town in a post-Huntley future.

5.1. Community Organizing Efforts

For two and a half years, Stuhlmiller, Lipsitz, and Newberry worked with Tonawanda community members to plan for Huntley’s shutdown. At its core, the coalition, which came to be known as the Huntley Alliance, consisted of an informal group of four to eight people representing CACWNY, the Kenmore-Tonawanda Teachers Association, WNYALF, and the Town of Tonawanda. Through a series of in-person meetings and phone calls, this group organized at least 10 public listening sessions in which between 30 and 100 community members met to discuss how to care for the community in the event of a Huntley closure. They also organized door-to-door surveys to gauge public opinion and voter registration drives to pressure public officials for support (Lipsitz, interview with authors, 2020).

The first meeting of the coalition went smoothly. The group was joined by representatives of the Sierra Club and IBEW. All parties agreed on the need to address Huntley’s eventual shutdown. But problems arose quickly thereafter. At the next meeting, members of the Sierra Club organized a protest. A group of people demonstrated outside the meeting—some wearing union T-shirts—to call for the immediate shutdown of the Huntley plant to prevent further pollution (McGowan 2017a). The demonstration enraged IBEW members, who maintained a close relationship with NRG and for whom Huntley was their source of employment. Further, it threatened to permanently alter the Huntley Alliance’s reputation; IBEW members and elected officials alike accused the demonstrators of trying to sabotage the plant. Following the incident, the coalition collapsed and remained inactive for over six months (Lipsitz and Newberry 2016).

But Huntley’s shutdown still loomed, so the coalition sought to regroup. In early 2014, the parties reconvened to once again discuss how to cope with the economic impact of losing Huntley as a source of tax revenue and employment. This time, the Sierra Club did not protest and took a somewhat sidelined role. IBEW, still wary of the coalition’s intentions, did not return (McGowan 2017b). In rebuilding the coalition, the leadership took an agnostic approach to Huntley shutting down; they would not seek to expedite the plant’s decline, but rather would just plan for its eventual closure. The late January 2014 publication of a report by the Institute for Energy Economics and Financial Analysis predicting Huntley’s imminent shutdown—strictly on a profitability basis—bolstered this stance. With the understanding that the plant was headed toward shutdown anyway, coalition members could focus exclusively on planning for the event (Lipsitz and Newberry 2016).

5.2. Lobbying Efforts

For the first two years, the coalition maintained a distance from state elected officials. Throughout their community organizing, the stakeholders remained focused on local residents and organizations to best present a united front (Lipsitz, interview with authors, 2020). Finally, in spring 2015, coalition members decided to lobby for support from the state government. In Emminger’s telling, the group organized three or four trips to Albany, where a group of 10–12 people pressed elected officials to provide funding to help Tonawanda manage the fiscal impact of Huntley’s closure. During their visits, the group met with Assemblyman Robin Schimminger, State Senator Marc Panepinto, and members of the office of Governor Andrew Cuomo.

Emminger and Lipsitz both recalled a unanimously receptive audience for their requests. Within nine months of when the coalition first approached lawmakers, Governor Cuomo signed into law a fund that would support Tonawanda and the school district for five years following Huntley’s retirement (see Section 5.3).

The Huntley Alliance was widely hailed as an example of community organizing done right, both by news outlets and just transition experts (Skibell 2020; McGowan 2017a; Buffalo News 2016; Reiter 2017; Cha 2019; NADO 2017; Cha et al. 2019). The coalition had successfully engaged a diversity of stakeholders and accomplished its goal of securing mitigation funding to smooth the fiscal impact of Huntley closing. The formation of a functional coalition of diverse community stakeholders, such as the Huntley Alliance, is arguably one of the key just transition best practices to be gleaned from the Huntley experience.

Lipsitz attributed the success of the Huntley Alliance to unity within the coalition. Such an achievement was far from ensured, given the delicate balance between environmental and labor organizations. Stakeholders had to make an effort to avoid stereotyping; labor organizations had to demonstrate a commitment to the environment, while environmental groups had to show they were not anti-industry. Lipsitz also lauded the strategy of waiting to involve state elected officials—by focusing first on community organizing, the coalition was able to present a unified front and make succinct lobbying requests that were difficult for elected officials to refuse. By fostering unity at home, the coalition laid the groundwork for government support.

5.3. The Electric Generation Facility Cessation Mitigation Fund

Fiscal support for Tonawanda came in the form of an omnibus spending bill, S6012, that passed the New York State Senate and was signed into law on June 26, 2015. Included in the bill (Part C, Subpart H) was a $19 million outlay for the Urban Development Corporation (UDC, the corporate entity of Empire State Development) to aid communities facing tax shortfalls as a result of fossil fuel power plants closing. The UDC was empowered to disburse these funds to any “municipal corporation or school district” that had seen a 20 percent or greater reduction in tax or PILOT collections from a fossil fuel power plant within its taxing jurisdiction. Communities meeting these criteria could apply to the UDC and, if approved, receive a disbursement to support their revenue base. The payment was up to 80 percent of the lost revenue in the first year after the plant’s shutdown and would decrease every subsequent year. Applicants could reapply every year for up to five years. According to the bill, the fund would be active from April 1, 2016, until July 1, 2025, or until the $19 million was fully expended, whichever occurred first.

The 2016–17 New York State budget expanded the fund and relaxed the eligibility requirements. Part BB, Section 1 of Appropriations Bill S6408-C/A9008-C (2016) set aside a total of $30 million for the fund, now called the Electric Generation Facility Cessation Mitigation Fund. Eligible entities included any “county, city, town, school district or special district” where any (rather than just fossil fuel) electric generation facility had permanently shut down on or after June 25, 2015 (State of New York 2016). Funding for this program was drawn from RGGI allowance proceeds (S6408-C 2016).

Following a coordinated effort between Assemblyman Schimminger and State Senator Jacobs, the 2017–18 New York State budget further expanded the Electric Generation Facility Cessation Mitigation Program (EGFCMP). In Appropriations Bill S2008-C/A3008-C, the state legislature authorized an additional $15 million in proceeds from RGGI for the fund, bringing the total to $45 million. The appropriations bill also extended the period over which entities could draw from the fund. According to the new funding plan, municipalities could receive up to 80 percent of lost revenue during the first year. Disbursements would then decrease by 10 percent of the lost revenue each year, and recipients could reapply for up to seven years (S2008-C 2017).

The 2018–19 New York State budget expanded the EGFCMP by another $24 million, bringing the total pot to $69 million. The legislature made no changes to the source of funding or the nature of the support provided (DiNapoli 2018).

5.4. The EGFCMP’s Impact on Tonawanda

The Town of Tonawanda received $607,000 from the EGFCMP in 2017, $533,000 in 2018, $449,000 in 2019, $369,000 in 2020, $295,000 in 2021, and $227,000 in 2022—in total, $2.5 million (Town of Tonawanda 2016, 2017a, 2018, 2019, 2020, 2021). The town will receive its final disbursement, $163,000, in 2023 (Figure 6).

Figure 6. Town of Tonawanda’s received and expected support from the EGFCMP

Figure 6.png

Data source: Town of Tonawanda’s received and expected support from the EGFCMP.

Town revenues fell only 0.5 percent in the four years since Huntley closed, and the annual operating budget actually grew 3.3 percent (Town of Tonawanda 2016, 2019), in part thanks to funding from the program. Property taxes in Tonawanda, rather than increasing to compensate for the loss of PILOT revenue, fell by 3.8 percent between 2017 and 2020 (Erie County 2016, 2020a). Because of data limitations, we do not have similar estimates for the fund’s impact on Erie County and the school district.

Members of the Huntley Alliance expressed satisfaction with the legislative response to Huntley’s closure. Emminger called the intervention “enormously successful,” noting that it allowed Tonawanda to maintain its revenue base without increasing taxes on anyone. While admitting that the town may have to slow down hiring in the future as funding from the program decreases, he said that no services have been curtailed and no town employees were laid off as a result of Huntley closing. Labor leaders were similarly pleased with the outcome; many had feared that the town would have to increase property taxes to compensate for Huntley’s closure, potentially causing some employers to relocate their facilities elsewhere (Lipsitz, interview with authors, 2020). Dave Wasiura, assistant director of the local chapter of USW, likewise said that many jobs had been saved.

6. Tonawanda Tomorrow

The EGFCMP provided Tonawanda, Erie County, and the Kenmore-Tonawanda School District with a temporary reprieve from the fiscal impact of Huntley’s closing. But with the funding set to run out after 2023 and no clear plan for repurposing the site and replacing the lost tax revenue, local leaders recognized the need for a sustainable long-term strategy (Emminger, interview with authors, 2020).

Building on the momentum of the Huntley Alliance, Newberry and Lipsitz began laying the groundwork for a community-driven, and more formalized, planning process that would chart the town’s post-Huntley economic development. They petitioned the support of US Senator Chuck Schumer, who publicly urged the US Economic Development Administration (EDA, an agency in the Department of Commerce) to provide the funding necessary to pursue this project (Lipsitz, interview with authors, 2020; Schumer 2015).

Locally, Lipsitz and Newberry convened a coalition of local organizations to contribute to the planning process. The process was formally hosted by the Town of Tonawanda Department of Planning and Development, overseen by its director, Jim Hartz. Major decisions and guiding principles fell to an Advisory Committee consisting of local stakeholders, including the Buffalo Center for Arts and Technology, CACWNY, Erie County, and WNYALF. The committee also solicited the guidance of the University at Buffalo Regional Institute (UBRI) and the Delta Institute, a Chicago-based environmental consulting firm (Tonawanda Tomorrow 2017).

On July 22, 2016, the EDA awarded $160,000 to UBRI via the Partnerships for Opportunity and Workforce and Economic Revitalization (POWER) initiative—an Obama administration multiagency program focused on economic development in coal-impacted communities—to support this planning effort (EDA 2016). The coalition called its project Tonawanda Tomorrow and kicked off a 10-month program of research and community engagement to produce a comprehensive plan for the town’s post-Huntley future.

6.1. Objectives

Tonawanda Tomorrow described itself as follows: “Tonawanda Tomorrow is a community partnership with the Town of Tonawanda, community groups, local businesses, organized labor and residents. The effort is focused on creating good-paying jobs for the 21st Century, preparing our residents and workers for those jobs, and reinvesting in our community to preserve what makes Tonawanda such a great place to do business and raise a family” (Tonawanda Tomorrow 2017).

  • The group sought to answer the following questions:
  • How does the town maintain high-quality public service and address its aging mid-twentieth century infrastructure as its tax base has declined?
  • How can industry thrive in Tonawanda while not raising public health concerns?
  • What can be done with vacant land from Tonawanda’s industrial past to pave the way for the economy of tomorrow?
  • How does Tonawanda generate an economic vision for its future that is resilient, supports good jobs, and promotes equitable development?

In answering these questions, Tonawanda Tomorrow separated its work into three categories: economy, workforce, and placemaking. Its members envisioned a plan that, if enacted, would lead Tonawanda to a future in which the town is fiscally healthy, the workers and community members are protected, and the land is sustainably used to its full potential (Tonawanda Tomorrow 2017).

In the words of Joseph Emminger, Tonawanda Tomorrow was a “wish list” for Tonawanda’s future. Though spurred by the closure of Huntley, Tonawanda Tomorrow had evolved into a comprehensive plan for the town’s development. The loss of Huntley occurred within a decades-long economic slide for the town, and members of the Tonawanda Tomorrow group saw an opportunity to use the attention it generated to catalyze a broader reimagining of the town’s future.

6.2. Support

Tonawanda Tomorrow’s leadership estimated a total cost of $266,667 for developing the plan (EDA 2016). The $160,000 from the EDA enabled Tonawanda Tomorrow to establish itself, commence outreach, and engage consultants. According to Cindy Winland, then director of strategic priorities at Delta Institute, UBRI was well suited to provide data analysis for the project but not to carry out community outreach, so from fall 2016 through spring 2017, the Advisory Committee, under the auspices of CACWNY, sought further funding to expand the community engagement effort. It succeeded in attracting grants from the Just Transition Fund, the Energy Foundation, the Ben and Jerry’s Foundation, the Rockefeller Foundation, and the Baird Foundation. The additional funding enabled Tonawanda Tomorrow to host public assemblies, procure outreach materials, and continue to finance its research effort. Tonawanda Tomorrow also benefited from in-kind contributions from CACWNY, the Kenmore-Tonawanda Chamber of Commerce, WNYALF, the Buffalo Center for Arts and Technology, and UBRI. These organizations provided a combination of staffing, outreach support, graphic design, research, and advising throughout the process (Tonawanda Tomorrow 2017).

6.3. Process

In creating a comprehensive vision for the town’s future, Tonawanda Tomorrow sought to outline a strategy that was both backed by research and supported by the community. Accordingly, preparation for the final report proceeded along two tracks.

UBRI led the effort to ground the planning process in data. Researchers at UBRI compiled an economic and demographic profile of the town and tracked its development over time (Winland, interview with authors, 2020). Drawing chiefly from US Census Bureau data, they outlined the town’s current economic outlook, as well as its population decline since 1970. The purpose of this exercise was to establish a starting point against which to plot the town’s development. Additionally, the researchers conducted case studies on four different communities—in Missouri, Alabama, Pennsylvania, and Germany—that had recently dealt with the closure of a coal facility, seeking to elucidate best practices that might be applied in Tonawanda. Lastly, they reviewed 15 different local development plans—including the 2014 Waterfront Land Use Plan, the 2014 Town Comprehensive Plan, and the 2011 Town Economic Development Strategy—to situate the Tonawanda Tomorrow plan against the backdrop of the town’s broader development strategy (Tonawanda Tomorrow 2017).

As UBRI conducted the research component of the Tonawanda Tomorrow process, the local organizations that staffed the Tonawanda Tomorrow Advisory Committee managed community engagement (Lipsitz, interview with authors, 2020). The goals were to align the recommendations of the plan with the desires of the community and to seek out new ideas for revitalizing Tonawanda’s economy and land base. Between July 2016 and June 2017, the committee publicized the project through flyers, social media, email, and word of mouth; held four public brainstorming sessions; and distributed an online survey. In all, Tonawanda Tomorrow received input from over 1,000 individuals and 20 local organizations (Tonawanda Tomorrow 2017).

6.4. The Report

On May 17, 2017, Tonawanda Tomorrow released its report for public comment (Fischer 2017a). The report reviews the town’s socioeconomic situation, lays out a series of strategies for development (the bulk of the report), and addresses the actions necessary to execute these strategies.

The strategies presented in the report are divided into three categories. The first category, “Economy,” focuses on creating a diverse, resilient, and sustainable economic base that would reposition Tonawanda as a regional manufacturing center, while also supporting the growth of local small businesses. The second, “Workforce,” involves protecting the wages, benefits, and working conditions of Tonawanda’s existing workforce, while also preparing Tonawandans for the job market of the future through training and education. The third, “Placemaking,” concentrates on taking advantage of Tonawanda’s setting to foster a physical environment that is healthy, inviting, inclusive, and productive. For each category, the plan sets forth multiple strategies, along with “priority actions,” “partnerships opportunities,” and “momentum to build on” that would help Tonawanda execute them (Tonawanda Tomorrow 2017).

The plan suggests three main strategies for each category. Regarding the economic strategies, the first aimed to “position the town of Tonawanda as a regional center for sustainable manufacturing and trade” by, among other things, attracting investment from the Western New York Regional Economic Development Council, obtaining a clean energy certification from the New York State Energy Research and Development Authority, and engaging utility companies to make large sites “shovel ready” for heavy manufacturing facilities. The second would “extend support services to Tonawanda’s small and medium sized businesses to export and expand” by educating business owners about foreign markets, promoting the town’s reestablished Low-Interest Small Business Loan Program, and increasing participation of small businesses in trade associations. And the third would “connect businesses and entrepreneurs to our region’s growing innovation ecosystem” by marketing the services of local consulting and innovation firms, setting up coworking spaces in underutilized structures, and fostering partnerships between local schools and businesses (Tonawanda Tomorrow 2017).

Concerning the workforce strategies, the first sought to “help businesses with aging workforces cultivate talent and attract new workers” by, among other things, surveying local businesses to identify workforce needs, engaging regional workforce development agencies to promote sector-based workforce development strategies, and informing hiring agents at local companies about training and education opportunities for employees. The second was to “strengthen the career pipeline for students to access jobs in Tonawanda” by raising awareness among local high school students of jobs that do not require a bachelor’s degree, developing internship programs, and investing in partnerships between local businesses and schools. And the third would “create a local workforce network focused on the needs of Tonawanda workers and businesses and bringing together resources to increase access to opportunities” by identifying an external organization that could lead the effort, implementing a program that would offer assistance with online job applications, and encouraging the Buffalo and Erie County Workforce Investment Board and the NYS Department of Labor to increase their regular presence in Tonawanda (Tonawanda Tomorrow 2017).

As to the placemaking strategies, the first would “cultivate tools, programs, and ownership solutions that can pave the way for increased public access to the water” by such actions as launching a community-based partnership to generate land use strategies, working with the Brownfield Opportunity Area Program to prepare sites for future use, and identifying recreation activities that would suit Tonawanda’s multiuse waterfront. The second proposed to “revamp the Town’s zoning code to emphasize walkability, diverse transportation options, mixed-use development, and other design principles attractive to young people and families” by promoting mixed-use development, partnering with the Niagara Frontier Transportation Authority to promote transit-oriented development, and repurposing existing auto corridors for other uses. And the third would “connect Tonawanda’s recreation and tourism attractions and niches to regional destinations and initiatives” by promoting the town with Visit Buffalo Niagara, obtaining a “Playful City” certification, and examining tourism-related uses for the former Huntley property (Tonawanda Tomorrow 2017).

As is clear, Tonawanda Tomorrow plan, though ostensibly a response to the closing of Huntley, had evolved into an ambitious and comprehensive plan for Tonawanda’s physical and economic revitalization. In doing so, it imagined a future in which the town would not only recover from the loss of Huntley but also develop a thriving, sustainable way of life that would drive (rather than suffer from) the transition to a green economy.

6.5. Reception and Implementation

News of the Tonawanda Tomorrow plan’s publication was widely circulated in local media outlets, and the plan was subsequently adopted as one of the central strategic documents for the town’s Planning and Development Department (Fischer 2017b). It received broad praise from organizations such as Greenpeace, the International Labour Organization, and the editorial board of the Buffalo News (Greenpeace 2020; ILO 2015; Buffalo News 2018b). The Tonawanda Tomorrow plan is notable for its wholesale adoption by the community and local decisionmakers. The strength of public consensus undergirding the plan has forced would-be developers to abide by its tenets. Emminger recalled being pleasantly surprised to learn that the proposed buyer of the Huntley site was well acquainted with the plan before signing a letter of intent. He noted that other developers had been “using it as a guide to understand what the community wants to see.”

More broadly, however, the implementation of the plan has faced some challenges. Following the publication of the report, Tonawanda Tomorrow created an Implementation Team, staffed by the town, to oversee the execution of the strategies outlined. The team met regularly throughout 2018 but stalled in 2019 as a result of “staffing issues” (CACWNY 2019). In December 2019, the Clean Air Coalition, frustrated by the team’s inaction, convened the organizations involved in the planning process to assess their progress on implementation (Newberry et al. 2019). The division of tasks was as follows (CACWNY 2019):

  • Town of Tonawanda: tasks related to land development, accessibility, and energy
  • Kenmore-Tonawanda Teachers Association: tasks related to workforce development and vocational training
  • WNYALF and USW: tasks related to expanding Tonawanda’s job market
  • CACWNY: tasks related to sustainable development
  • Tonawanda Tomorrow Implementation Team: tasks related to community engagement (the team’s work stalled and it has not yet completed its tasks)

The onset of the coronavirus pandemic in 2020 threw into question the future of many Tonawanda Tomorrow–associated projects, particularly those that required significant capital expenditure (Lipsitz, interview with authors, 2020). Further, the suspension of the planned sale of the Huntley property in late June 2020 halted much of the planned redevelopment of the waterfront (Emminger, interview with authors, 2020; see Section 7.2 for more detail on the redevelopment process).

7. Outlook

7.1. Economic and Labor Market Developments

Efforts to mitigate the impacts of Huntley closing met with success when it came to employment. Every one of the 79 people who worked at the plant before its closing either found a new job or retired after the plant closed. Much of the credit for this success goes to IBEW Local 97, which worked with Huntley employees and local employers to find new jobs for those laid off and secured benefits for those who decided to retire (Pignataro 2015; Wasiura, interview with authors, 2020; Lipsitz, interview with authors, 2020).

But Huntley’s closure threatened local employment in three indirect ways: an interruption in the supply of raw water or an increase in property taxes to compensate for the loss of PILOTs could have caused employers to relocate out of town, and loss of revenue to the town and school district could have forced them to lay off employees. None of these events occurred. Negotiations over the property’s sale avoided any interruption in the water supply, although this arrangement is now in danger because of the sale’s suspension. And the town has neither laid off employees nor raised taxes, thanks in part to mitigation funds from the state government, according to town officials (Emminger, interview with authors, 2020). The school district has laid off employees, but this is also correlated with its long-term consolidation process, which may suggest minimal impact from the Huntley closure (Habuda 2011a).

Additionally, Lipsitz said that Sumitomo Rubber added jobs to its Tonawanda facility after the water supply issue was clarified, and manufacturing employment has grown modestly in recent years. The most significant development, however, was the opening of a new Amazon distribution center in June 2020. The facility occupies 117,000 square feet and created 600 new jobs with wages of $15/hour and up (Spectrum News 2020). It serves as a sign of a growing and diversifying job market in the post-Huntley years.

The shutdown of Huntley occurred against the backdrop of several complex socioeconomic trends, making it difficult to isolate the closure’s long-term effects and even more difficult to predict the ultimate outcome. The plant’s closure happened during an ongoing population decline in the region and reorientation of the local workforce away from manufacturing and toward a service economy. The coronavirus pandemic further complicated the post-Huntley recovery. Manufacturing has been hit particularly hard, and many planned development projects have been put on hold. A full accounting of the town’s success in adapting to the closure of Huntley will likely not be possible until several years from now.

7.2. Site Redevelopment

The effort to redevelop the Huntley property has had limited success. For many in the town, redeveloping the site has been a top priority in responding to Huntley’s closure, as this would provide an opportunity for new jobs and new revenue, and the site would be a linchpin in a larger riverfront reclamation plan. But the path to redeveloping the Huntley site has proved challenging.

First, NRG proceeded at what some considered to be a slow pace, waiting until March 2018 to put the site up for sale. Even then, it refused to list an asking price, suggesting it shared little of the urgency felt by local residents. Anxious to resolve the question of raw water access, the Town of Tonawanda sought to take control of the property through eminent domain beginning in September 2018 (Holmes 2019). Finally, in April 2019, NRG announced it had found a buyer. Though NRG refused to disclose details about the sale, it later emerged that the buyer was a company called WarrenBrook Redevelopment, which specialized in redeveloping power plant and brownfield sites (Watson 2021). In response, the town halted eminent domain proceedings five months later.

But on June 30, 2020—without warning or explanation—NRG announced that the sale had been suspended. The announcement shocked town officials and even, seemingly, the buyer (O’Brien 2020). In February 2022, the Town of Tonawanda once again launched eminent domain proceedings for the site (see Appendix C for more detail on the redevelopment process).

7.3. Water Supply

As of fall 2022, labor leaders and town officials expressed satisfaction with the outcome of the struggle over raw water access (Wasiura, interview with authors, 2022). Though no long-term arrangement has been unveiled, NRG has renewed its water supply contract with at least one local manufacturer and said it intended to continue supplying nearby businesses (Emminger, interview with authors, 2020).

The June 2020 announcement of the sale’s suspension, however, threw the situation into turmoil once again. Though NRG still communicated its willingness to supply raw water, the suspension left the fate of the town’s manufacturing activity in the hands of NRG. While this provided short-term continuity, Emminger reported that the town was in dialogue with local manufacturers regarding an arrangement that would allow the town to directly provide nonpotable water to these industrial facilities.

8. Conclusions

As the United States, and the rest of the world, proceeds with a transition to a low-carbon economy in an effort to address the threats of climate change, communities that have depended on fossil fuel production or the industrial consumption of fossil fuels (e.g., electricity generation) as an anchor of their local economy may face adjustment challenges. To address these challenges, and in an effort to facilitate a just transition, communities and policymakers can learn from those that have gone through similar processes. The civic and economic process that developed around the closure of the Huntley plant is one such example; however, due to circumstances unique to Tonawanda and the state of New York, the applicability of this case to communities embedded in larger regions undergoing energy transition may be limited. Following is a summary of some of the lessons that may be drawn from the Huntley experience:

  • Start planning early. A proactive approach to transition is essential for securing funding, coordinating stakeholders, and planning redevelopment. By beginning to organize in 2013, for instance, the Huntley Alliance was able to ensure state support when Huntley shut down in 2016. Communities and organizations facing a transition should begin planning as soon as it becomes clear that a facility will shut down, and energy companies should endeavor to provide early warning.
  • Formalize the transition. Without dedicated personnel, funding, and programming, transition planning can lack focus and easily lose momentum. To the extent possible, communities should seek to formalize the transition process through codification, budgeting, and institutionalization. One especially important type of such formalization is the establishment of a civic body (such as a committee, coalition or advisory council) tasked with engaging stakeholders, leading a deliberative process, and creating a transition plan. This can be done by government (e.g., the state of Colorado’s Just Transition Advisory Committee) or by nongovernmental entities. The Huntley Alliance is an example of such formalization in Tonawanda.
  • Engage a diversity of stakeholders. Within this sort of formal civic forum, it is important to engage diverse stakeholders early to ensure representation of the variety of community interests that will ultimately have a say in transition and development decisions. Unions deserve credit for many of the successes in mitigating the fallout from Huntley’s closure. Thanks to IBEW, none of the workers laid off by NRG in 2016 faced extended unemployment. USW played a pivotal role in obtaining assurance from NRG that businesses would not lose access to inexpensive water supply. WNYALF and the Teachers Association were instrumental in securing mitigation funding from the state and in the crafting of Tonawanda Tomorrow. While union presence may vary in other locations, involving workers throughout the transition process can generate a higher degree of community buy-in and better outcomes for workers.
  • Identify a common objective. Some of the community leaders we interviewed believe that the reason the Huntley Alliance was successful in persuading elected officials to provide state support was that it achieved and projected unity. The coalition was able to overcome ideological differences by defining a narrow objective on which they could agree. Defining a clear common objective at the outset can make the process of navigating transition proceed more smoothly
  • Expect and plan for indirect and systemic consequences. As the questions over raw water access in Tonawanda demonstrate, coal facility retirements can set off a complex cascade of system effects that can have significant impacts within the economy and community. Such consequences will likely vary by location. Proactive engagement with a diverse array of stakeholders can help planners anticipate potential indirect consequences. Federal support for energy transition programs should have sufficient flexibility to address local variations.
  • Procure transition funding from state and federal agencies. The retirement of a coal facility can eliminate significant portions of local government tax revenue, making it difficult to locally fund all that is required to navigate the transition successfully. Dedicated state and federal transition funding can be used to support planning and implementation, help local governments mitigate the immediate fiscal impact of the shutdown, and provide them with a window in which to plan for an economic transition. The New York EGFCMP provided this type of support to local governments that received tax revenue from Huntley. Such programs could be adopted nationwide or in other states to support communities in a similar situation.

Tonawanda is an example of what is possible when communities take a proactive, collaborative approach to transition planning. However, site redevelopment has met with challenges and setbacks, with an already drawn-out process further complicated by the suspension of a purchase agreement. One final lesson from the Huntley experience therefore may be that navigating such transitions tends to take time and persistence—and that with such persistence, positive change may be possible.